https://www.geekmcq.com/
CSS Solved Papers
Physics Chemistry

Engineering :: Production Engineering


  The riser in a mould should be located in such a way so that
[A]. it is first to receive the molten metal[B]. it is last to solidify
[C]. it is first to solidify[D]. it touches all parts of the casting

Answer: Option B


Write your comments here:
Name *:     Email:

© 2012-2024 by GeekMCQ™ Technologies. All Rights Reserved | Copyright | Terms of Use & Privacy Policy | Referals

Contact us: info@geekmcq.com