https://www.geekmcq.com/
CSS Solved Papers
Physics Chemistry

Engineering :: Irrigation Engineering


  A canal head work in rocky stage of a river is not suitable because
[A]. more cross drainage works are required[B]. a costly head regulator is required
[C]. more falls are necessary to dissipate the energy[D]. all of the above

Answer: Option D


Write your comments here:
Name *:     Email:

© 2012-2025 by GeekMCQ™ Technologies. All Rights Reserved | Copyright | Terms of Use & Privacy Policy | Referals

Contact us: info@geekmcq.com