https://www.geekmcq.com/
CSS Solved Papers
Physics Chemistry

Engineering :: Concrete Technology


  When the batching of material is done by weight
[A]. the bucket in which the material is to be weighed should be cleaned thoroughly[B]. the weighing machine should be levelled before placing the material
[C]. the chart should be prepared indicating the weight of each material used for different strengths of concrete[D]. all of the above

Answer: Option D


Write your comments here:
Name *:     Email:

© 2012-2025 by GeekMCQ™ Technologies. All Rights Reserved | Copyright | Terms of Use & Privacy Policy | Referals

Contact us: info@geekmcq.com