Engineering :: Concrete Technology
|
|
|
|
|
|
Which of the following statement is wrong?
|
[A]. |
If the height of pile exceeds 1.44 m, the cement bags should be arranged in header and stretcher fashion. | [B]. |
The cement bags should be rolled on the floor when it is taken out for use.
|
[C]. |
The strength of cement decreases with the passage of time. | [D]. |
none of the above |
|
|
|
|