Engineering :: Concrete Technology
|
|
|
|
|
|
The prevent the cement bags from any possible contact with moisture, the main point that should be kept in mind is that the
|
[A]. |
space between the exterior walls and piles should be 30 cm | [B]. |
cement bags should be placed closer together in the piles
|
[C]. |
width and height of the pile should not exceed 3 m and 2.70 m respectively | [D]. |
all of the above |
|
|
|
|