Engineering :: Concrete Technology
|
|
|
|
|
|
In performing the works test
|
[A]. |
the mould for test specimen should be made of non-absorbent material | [B]. |
the mould should be constructed in such a way that there is leakage of water from test specimen during moulding
|
[C]. |
the base plate of the mould should be of non-absorbent material | [D]. |
all of the above |
|
|
|
|